Chronicle of Events
October 2014     —— passed the certification of Shanghai Volkswagen and Shanghai General Motors;
October 2014    —— the powder coating line was put into production;
September 2014    —— the powder coating line was built;
July 2014    —— the suspension electrophoresis line was put into production;
April 2014    —— the suspension electrophoresis line was built;
January 2014    —— passed TS certification and obtained TS16949 certificate;
June 2012    —— the gantry electrophoresis line was put into production;
February 2012    —— the gantry electrophoresis line was built;
November 2011      —— Jiaxing Hua’an Auto Parts Co., Ltd. was incorporated.